Project Start: September 2018
The “Greenhouse” project is resting this year, because we did not manage to arrange room for the oldtimer mopeds.
For the time being we have begun to enlarge the conservatory at the house and hope that most of the work will be done before the onset of winter.
The rest and the greenhouse will be delivered in the spring.
Status: October 2018
In the nice weather you have to continue with the construction project. With some weather luck, we can still build the walls!
Status: May 2019
The empty conservatory is waiting for change…
Status: June 2019
The heating tubes were placed in the wall and plastered immediately after the leak test.
Status: July 2019
In July, we focused only on the further expansion.
First, the old roof was removed and built the new construction. The intended metal roof plates for the cover, we first put loose as weather protection. We noticed that the conservatory was now too dark, whereupon we decided to make the front part with plastic roof sheets translucent. While we were waiting for the delivery, we built the window frames, laid plasterboards and plastered the new walls. The old house wall was mostly left in its original state.
Status: August 2019
Laying tiles, painting beams, installing front frame and making exterior plaster on roof level – done, so that everything ready for the installation of the hollow panels.
Status: September 2019
Finally the roof finished, as well as the rest of the exterior plaster. For the way we have used beautiful old tiles from our find stock.
Status: October 2019
Shortly before the completion of the project… the houseplants were sintered.
Status: November 2019 – READY
On the outside, the gutter that we need to have made is missing; and inside we still need 2 bookshelves, which are already in work.
But we are set up, the plants are housed, the heating works and we now spend a lot of time on the sofa.